Project Description

We worked on 4.42 miles of I-57 in Iroquois Country between IL-116 and US 24. The entire section was milled down to the existing concrete and resurfaced with 4” of asphalt polymerized binder course and 1.5” of polymerized asphalt surface course. This project also included the removal of three sets of dual structures to be replaced with double box culverts.

Back to Projects